Kanuni drill ship opened to the Black Sea for its first mission

Minister Dönmez stated that the Kanuni drill ship was opened to the Black Sea for its first mission.

Fatih Dönmez, Minister of Energy and Natural Resources, shared on his Twitter account, “Our Kanuni drilling ship was opened to the Black Sea with the prayer of our nation for its first mission. Our ship, which will make its first drilling in Sakarya Gas Field, will perform deep sea well tests in Türkali-2 well. get it. ” used the expressions.

The 6th generation deep-sea drilling ship Kanuni, which joined the inventory of the Turkish Petroleum Corporation (TPAO) in 2020, has a length of 227 meters and a width of 42 meters and can drill up to a depth of 12,200 meters.


labels


Source: bigpara- GÜNDEM by bigpara.hurriyet.com.tr.

*The article has been translated based on the content of bigpara- GÜNDEM by bigpara.hurriyet.com.tr. If there is any problem regarding the content, copyright, please leave a report below the article. We will try to process as quickly as possible to protect the rights of the author. Thank you very much!

*We just want readers to access information more quickly and easily with other multilingual content, instead of information only available in a certain language.

*We always respect the copyright of the content of the author and always include the original link of the source article.If the author disagrees, just leave the report below the article, the article will be edited or deleted at the request of the author. Thanks very much! Best regards!